Roof Tops and Pit Stops

Week Beginning 14 December 2025

The last full working week before Christmas is always a funny one. You’re still flat out, the weather is doing its best to ruin your plans, and everyone’s mentally half way to the sofa already. This week was no exception.

Between high-level roof repairs, battling rain at precisely the wrong moment, swapping work vans, and being humbled by seven-year-olds on the tennis court, it was a proper end-of-term week for the Cherry Picker Man.


Sunday – Football, Fireplaces and Filthy Chimneys

Sunday started with fatherly duties, heading over to West Bridgford so Robyn could make her debut for the Ravenshead Girls Under-7s football team. She played an absolute blinder in right midfield. Sadly, it wasn’t quite enough to stop a 2–0 loss, but effort levels were high and morale remained intact.

From football boots straight into festive mode with the annual Secret Santa trip to Smiths Toys. £20 each, one present each, and total chaos as usual.

Work-wise, Storm Brame had other ideas. At 2pm I headed to Tresswell, South Yorkshire, to help stove installer Steve drop a new chimney liner. What should have been straightforward turned into two hours of soot, bird nests, and discovery of a chimney missing its mid-feathers entirely. With structural concerns and fire risks obvious, the sensible decision was made to abort the liner install and plan proper repairs in the New Year.

Sometimes the best job you do is the one you don’t push ahead with.

Sunday ended clean, fed, and thankful for a roast dinner with family and in-laws.


Monday – Lead Valleys and the Countdown to Christmas

Monday marked the start of my final full week on site before Christmas, spent entirely at Trent College in Long Eaton. A familiar setting by now.

The day was focused on repairing lead valleys at the front of the school. Three valleys, all cracked, all leaking, all needing new lead and careful detailing to get them properly watertight again.

Once those were finished, I was asked to install two new downpipes after heavy rain had overwhelmed the gutters and caused internal damage. A good example of small external issues quickly becoming big internal ones if left unchecked.

Tomorrow promised repointing… and a very large cherry picker. Always a good sentence.


Tuesday – Traffic, Towers and 21 Metres in the Air

An early start at 7am should have meant arriving on site early. Instead, I spent nearly an hour crawling through Annesley with no obvious reason other than standing water and seasonal chaos.

Once on site, drizzle ruled out pointing the clock tower initially, so I cracked on with installing downpipes in one of the quadrants. This involved threading my machine through a narrow passage and a small doorway a gentle warm-up before heights.

When the weather cleared, it was straight onto the 21-metre-high clock tower with Seb. The rest of the day was spent grinding out and repointing brickwork, installing Helifix bars for structural integrity, and re-bedding slabs at the top of a chimney.

Home that evening for the Cubs’ annual Christmas party, followed by bed. No messing about.


Wednesday – Cold Steel, Cold Weather and a Numb Face

Wednesday went far better on the roads thanks to a route change. Lesson learned: avoid Annesley.

The day started with more downpipe installations before I was once again called away to help Seb on the Genie lift, spending most of the day fixing tiles and flashing at high level.

It was bitterly cold. One of those days where every bolt feels colder than the last. Granite Workwear earned its keep here, keeping me warm and functioning.

Logistics added extra fun: the Hilux was off having its windscreen repaired, so I had to swap all my tools into Hannah’s van before setting off. A faff, but temporary.

I left site slightly early for a long-overdue dentist appointment. The good news: tooth saved. The bad news: no feeling in my face for the rest of the evening. Thankfully, everything was back where it belonged by morning.


Thursday – Rain, Chimneys and Tactical Retreats

Thursday began by finally finishing the downpipes in the quadrant. The machine had been parked there for days thanks to repeated diversions to the Genie lift.

Speaking of which, the Genie lift work included replacing Rosemary tiles on the chapel roof, one of the tallest and most exposed parts of the school. While we had access, we made the most of it by re-flaunching a chimney on the highest point of the site.

Repointed, re-flaunched, five new cowls installed… and then it started raining.

Seb sprinted for a tarpaulin like his life depended on it, and we managed to cover the chimney just in time. A genuine last-minute save.

Soaked through, I headed back to the quadrant, sealed stepped lead flashing, and made the sensible call to finish for the day.

At home, I walked straight into my living room hosting a full-scale seven-year-old Christmas party. Noise levels were significantly higher than the wind that day.


Friday – Wrapping Up Loose Ends

Friday saw me finally move the machine out of the quadrant. It felt like it had become part of the architecture by this point.

I carried out further downpipe repairs, repointed coping stones on a high roof that had been letting water through, and repaired lead flashing on a bay window elsewhere on site. All preventative work aimed at stopping damp before it causes bigger issues.

From there, it was off to repair cast iron gutters for a couple experiencing leaks, then that was it. The last full working day before Christmas.

I got home in time to pick Robyn up from school and finish levelling stone at DJI HQ, creating a proper base to park the cherry picker. A small job, but a very satisfying one.


Saturday – Leaks, Tennis Defeats and Cake

Saturday started early with a 7:30am meet-up at Kingsmill Hospital in Mansfield, Nottinghamshire, alongside Neil and Daz from Wrights Roofing. The mission: solve a stubborn leak around a window.

Armed with frame sealant, a Stanley knife, and careful observation, we did what roofers do best – trimmed, sealed, and hoped for the best. Sometimes that’s all it takes.

Back home before 9:30am, I took Robyn to her final tennis session before Christmas in Newark, Nottinghamshire. Parents vs kids followed. The kids won. By a lot.

Coffee and cake in Newark followed with Hannah, Wren and Robyn, joined unexpectedly by Granny Ralph and Grumps, which made for a cracking morning.

The final Tesco shop before Christmas, a movie night, and that was that. A perfect way to end the week.


Final Thoughts

A full-on week of high-level access work, weather battles, teamwork, and family moments, exactly how the run-up to Christmas should be. Now it’s time to slow down, recharge, and get ready to do it all again in the New Year.


Keep up to date with me online

Workwear this week was kindly supplied by Granite Workwear, keeping me warm and protected through a cold, wet run-up to Christmas.
👉 https://www.graniteworkwear.com/?afid=danny

Leave a Reply

Your email address will not be published. Required fields are marked *